Kitlanya East is located immediately south of Sandfire Resources Motheo Production hub. The project is characterised by two drill tested large-scale anticlinal structures with preserved lower D’Kar Formation stratigraphy providing potential host rocks for analogues to the neighbouring T3 deposit.
The two main anticlinal target areas identified in detailed magnetic data, “Endurance” and “Perseverance”, are supported by encouraging copper, lead and zinc soil anomalies, folded trap-site features modelled from AEM data.
Drill tested lower D’Kar Formation stratigraphy with accompanying alteration and multi-generational veins add further support to the prospectivity of the targets.
2024:
2023:
2021:
2020:
2019:
2018:
Historical Data: